Infrastructure & Layout Planning of Vocational Lab

To cultivate practical competencies and skills alongside academic education, vocational and skill training has become a mandatory, core component of school curricula in accordance with the National Education Policy (NEP) 2020 and the National Curriculum Framework for School Education (NCF-SE) 2023.

To implement this directive, schools are advised to establish either a single Composite Skill Lab of 600 sq. ft. for classes VI–XII, or two separate labs of 400 sq. ft. each—one for classes VI–IX and the other for classes XI–XII.

The timeline for setup is determined by CBSE affiliation status: institutions seeking fresh affiliation must have a fully equipped Composite Skill Lab with all necessary machinery and equipment as a mandatory prerequisite. Meanwhile, already affiliated schools are required to establish this facility within three years of the circular’s issuance, establishing a compliance deadline of August 22, 2027.

Furthermore, the Board has formulated extensive guidelines to facilitate the setting up and functional management of school-based Composite Skill Labs. The inventory of machinery and tools detailed within these protocols is intended as a recommendation, allowing institutions to adapt their selection according to their specific readiness and needs.

This comprehensive manual, which delineates structural prerequisites, equipment standards, safety protocols, and strategic deployment phases, can be accessed via the official CBSE academic portal.

Recommended Vocational (Composite Skill) Lab Setup

Space Requirements

One Composite Skill Lab of 600 sq. ft. for Classes VI–XII

OR

Two separate labs of 400 sq. ft. each:

Lab 1: Classes VI–X

Lab 2: Classes XI–XII

Suggestive Infrastructure for Vocational Lab

Flexible workstations with movable tables

Storage cabinets for tools and consumables

Display boards and smart TV/projector

Adequate lighting and ventilation

Internet connectivity with Wi-Fi

Power outlets at workstations

Wash basin with water supply (where required)

Safety signage and emergency exits

Safety Equipment

Fire extinguisher

First-aid box

PPE (gloves, masks, goggles, aprons etc.)

Electrical safety devices

ICT Facilities

Desktop/Laptop computers

Printer and scanner

Projector/Interactive panel

Internet connection

Basic software for coding, AI, design, and office productivity

Learning Resources

Skill subject textbooks

Practical manuals

Charts and models

Digital content

Record Keeping

Lab register

Stock register

Maintenance register

Student practical record

Safety inspection register

Display Area

Student projects

Career information

NSQF level charts

Entrepreneurship corner

Innovation wall

Engagement with local industries/skill partners:

Institutes such as IIT, NIT, PSSCIVE, NID and local industries may be tied up to conduct special lectures and share insights on emerging industry trends. Their expertise will help expose students to real world applications, strengthen the purpose of vocational lab and bridge the gap between the school based learning and industry expectations.

Vocational Lab constructed under PM SHRI scheme should be named as “Innovation & Skill Centre”.

Vocational Education in Innovation & Skill Centre is categorized into three “Forms of Work”:

  1. Life Forms,  
  2. Machines & Materials, 
  3. Human Services. 

Suggestive posters can be installed in the Innovation & Skill centre

Hydroponic Setup In Vidyalaya

Leave a Comment

Your email address will not be published. Required fields are marked *